It isn’t immediately apparent but this was a particularly problematic project due to the existing surfaces and levels. The challenge was to design and construct the new building to suit the levels of the existing yard in the foreground. This meant introducing different slopes and levels into the new concrete floor to allow for vehicular access, and then designing and constructing the new building to suit the new levels. As you can see this has been achieved very nicely.